This duplex in April Sound, Montgomery County, Texas was delivered as a complete ground-up new construction project — two independent 2-story residential units built simultaneously on a single lot, from site clearing and foundation through final finish and inspection.
Each unit features a 2-car attached garage, open-plan living and kitchen on the first floor, and bedrooms on the second. The exterior combines natural stone veneer with fiber cement siding in a bold blue-and-cream palette, designed to stand out in the neighborhood while maintaining a classic residential character.
LIVALU managed the full scope: site preparation, foundation engineering, structural framing, MEP rough-in, insulation, drywall, cabinetry, flooring, tile, fixtures, and final punch-out. All photography on this page documents the actual project.
Project Specs
All photos on this page were taken on-site during and after construction. No stock images or renderings are used.
Scope of Work
Site & Foundation
Demolition & site clearing
CAT equipment grading
Engineered slab design
Rebar & vapor barrier
Concrete pump pour
Foundation inspection
Structure & Envelope
Full wood-frame structure
2-story framing both units
Roof system & sheathing
Fiber cement siding
Natural stone veneer
Windows & exterior doors
MEP & Systems
Electrical rough-in & panel
Plumbing supply & drain
HVAC system installation
Recessed lighting layout
Insulation & air sealing
Final inspections & permits
Interior Finishes
LVP hardwood-look flooring
White shaker cabinetry
Quartz countertops
Marble-look tile bathrooms
Open staircase with balusters
Fixtures, hardware & trim
Construction Timeline
Every photo below was taken on-site during the actual construction of this project.

Site Preparation
CAT skid steer clearing the lot. Framing begins in the background.

Foundation Pour
Rebar grid set and concrete pump truck delivering the slab.

Slab & Rough Framing
Foundation cured and structural framing underway.

Framing Progress
Wall and floor systems taking shape across both units.

Structural Framing
Second-floor framing and roof structure in progress.

Roof & Envelope
Roof system installed, building envelope closed.

MEP Rough-In
Mechanical, electrical, and plumbing systems roughed in before drywall.

Drywall & Finishes
Drywall installed, finish work beginning on both units.

Interior Progress
Cabinets, trim, and flooring installation underway.

Near Completion
Final finishes, fixtures, and exterior details.

Exterior Detail
Stone veneer and siding installation complete.

Final Exterior
Both units ready — driveways poured, landscaping cleared.
Finished Project

Exterior — Both Units
Exterior
Front Elevation
Exterior
Garage & Driveway
Exterior
Entry Hall & Staircase
Interior
Living Area
Interior
Kitchen
Interior
Kitchen Detail
Interior
Dining & Living
Interior
Primary Bedroom
Interior
Bathroom — Marble Tile
Interior